Thursday, 9 February 2012

Progress post

Today, we had a whole day dedicated to filming in order to complete our opening sequence. During this day we managed to do this. We had a little trouble to begin with as final cut express would not let us drop and drag footage into our timeline. Our teacher managed to fix this by wiping any preferences associated with final cut express. This then allowed us to add in our extra clips to break up the walking footage which took up a lot of our time without much actually happening. We added credits using final cut express and managed to overlay them onto our clips and then faded them in and out. After doing this we added our music, which needed slowing down slightly to be the right length. We also cut the music slightly so that it ended at the end of the phrase and ended on the right note. The movie was exported using quicktime conversion and we were able to upload our final piece onto youtube and embed it onto the blog.

No comments:

Post a Comment